A building products customer needed 28 flatbed truckloads of concrete barriers moved from Queens, NY into Connecticut over four days, seven loads per day, into jobsite locations that kept changing. MyFreightWorld coordinated the flatbed capacity, provided live ETAs, and relayed updated delivery coordinates to carriers, completing all 28 loads on schedule.
The Project
Moving concrete barriers for a highway project is as much a coordination challenge as a capacity one. This project required 28 flatbed truckloads over a four-day window, with seven loads moving each day from a Queens, New York origin into active jobsites in Connecticut. Because the work was tied to a live construction site, the delivery details did not stay still.
The Challenge
Moving concrete barriers for a highway project requires precise timing and clear communication. In this case, the delivery locations were not always tied to a fixed street address. Updated coordinates were used throughout the project, which added a layer of complexity for carriers delivering into active or changing jobsite locations. The main challenges included:
- Coordinating 28 flatbed truckloads over a four-day period
- Managing seven truckloads per day on a tight timeline
- Communicating changing delivery coordinates to carriers
- Keeping shipper, receiver, and carrier updates aligned
- Providing live ETAs and visibility throughout the project
- Helping ensure trucks were routed to safe and accurate delivery locations
With destination details changing, communication had to stay clear and consistent. A missed update could create delays, confusion, or put drivers in difficult delivery situations.
The Solution
MyFreightWorld supported the project by coordinating flatbed truckload coverage and keeping carriers updated as delivery details changed. The team worked to provide live ETAs, communicate updated destination coordinates, and keep all parties aligned as the project moved forward. When delivery locations shifted, MFW helped ensure carriers had the most accurate information available so they could reach the correct location safely and efficiently.
For a project of this size and pace, the role was not just finding trucks. It was managing the movement of each load across a fast-moving schedule while reducing confusion between the shipper, receiver, and carrier network.

The Result
The project was completed on time, successfully moving all 28 truckloads over the four-day window. By coordinating coverage, providing live ETA updates, and keeping carriers aware of changing delivery coordinates, MyFreightWorld helped the customer maintain momentum on a time-sensitive highway barrier project.
The customer also shared helpful feedback after completion: the value of a shared spreadsheet as a live update tool, adding delivery appointments, and allowing direct communication with the shipper and receiver to reduce delays. That input sharpens the process for future project freight, especially when delivery locations, jobsite access, or timelines are changing in real time.
Have a Project on the Calendar?
Tell us the lane, the equipment, and the schedule. We coordinate the capacity and the communication.
Get a QuoteFrequently Asked Questions
What type of freight was moved?
The project involved concrete barriers used for a highway construction project.
What equipment was used?
Flatbed truckload equipment was used for the full project.
Why was the project challenging?
It required 28 truckloads over four days, with seven loads moving each day. Delivery locations also changed throughout the project, and updated coordinates were used instead of a single fixed delivery address.
How did MyFreightWorld support the customer?
MFW coordinated flatbed coverage, provided live ETAs, communicated updated delivery coordinates, and helped carriers reach safer and more accurate delivery locations.
Was the project completed successfully?
Yes. All 28 loads were completed on time, and the project was considered a success.
What was learned from the project?
The customer noted that future projects could be improved by using a shared spreadsheet for live updates, adding delivery appointments, and allowing direct communication with the shipper and receiver to reduce delays.
Key Takeaway
Project freight requires more than capacity. It requires communication, visibility, and the ability to adapt quickly when details change. For this Northeast highway barrier project, MyFreightWorld coordinated 28 flatbed truckloads, managed changing delivery coordinates, and kept the freight moving on schedule. If you have project freight on the horizon, that is exactly the kind of work we are built to coordinate.
Ready to Move Your Project Freight?
Get a quote from MyFreightWorld and put a coordinated team on your next multi-load project.
Get a Quote